ELDORADO TREATED WATER

Project Info

Description: Wildstone was contracted by the District of Lake Country to construct a 6 million litre concrete reservoir and two pump houses to be integrated into their existing water system.

The interconnecting civil works were tied into the existing water mains and new concrete reservoir to complete the system. The project was split in two locations with one pump station near the town centre and the second pump station and reservoir near the existing facilities.

Category: Industrial

×

2 + 15 =

Or
Contact Us At One Of Our Locations