Project Info
Description: Wildstone added to the Village’s capacity for filtered water by adding 4 manganese greensand filters, new chemical injection lines, hypochlorite storage and all process mechanical to tie into an existing water system. The pre-engineered building was constructed atop of several holding and backwash tanks and new site piping and tie-ins were added in the local park.
Category: Water & Wastewater
