A ten-month schedule. Deep excavations, major lifts, and a fully operational plant throughout.

50.0407, -110.6791

Medicine Hat Wastewater Treatment Plant UV Expansion

The Medicine Hat WWTP UV Expansion was an aggressive ten-month build inside an active wastewater facility. Wildstone demolished the existing concrete effluent chamber and converted it into a multi-level UV chamber constructed of concrete and structural steel, and built a new concrete block building to house the UV facility. Two new UV banks were installed alongside vertical turbine and process pumps, wood stave alum tanks, compressors, weir gates, slide gates, new clarifier covers, and process piping.

A large hydro-excavated trench was cut for a new fire line upgrade, with two 48" carbon steel effluent pipe mains cored through an existing concrete wall and hoisted into the new building. Wildstone self-performed all mechanical work and held the general contract with the City of Medicine Hat.

Medicine Hat, AB

Coordinates

50.0407, -110.6791

Project

Medicine Hat Wastewater Treatment Plant UV Expansion

Status

CompletedFall 2010

Let’s Get to Work

If you’re planning a project and need a team that can handle the tough tasks, we’re ready to talk.