General contractor for a multi-facility water infrastructure upgrade in Lake Country, serving multiple distribution systems across the District.

50.0833, -119.4085

Eldorado Reservoir and Glenmore Booster Station

Wildstone served as general contractor for a multi-component water infrastructure upgrade for the District of Lake Country, completed in 2018. The project encompassed three facilities: the Eldorado Treated Water Reservoir, a 6,000 cubic metre reservoir with a valve room, 30-inch water main installation, and full inlet, outlet, overflow, and drain piping; the Glenmore Booster Station, a new building housing two 100hp process water pumps, three custom PRV trains, stainless steel process piping, and a complete HVAC package, boosting pressure from the Glenmore/Okanagan Reservoir to three distribution systems across the District; and the Eldorado Low Lift Station, which treats water from the existing reservoir via chemical injection before feeding the new treated reservoir and the Okanagan Lake distribution system, with three 100hp pumps and 30-inch stainless steel piping throughout.

Lake Country, BC

Coordinates

50.0833, -119.4085

Project

Eldorado Reservoir and Glenmore Booster Station

Status

Completed 2018

Let’s Get to Work

If you’re planning a project and need a team that can handle the tough tasks, we’re ready to talk.