Eldorado Reservoir and Glenmore Booster Station
General contractor for a multi-facility water infrastructure upgrade in Lake Country, serving multiple distribution systems across the District.

Eldorado Reservoir and Glenmore Booster Station
Wildstone served as general contractor for a multi-component water infrastructure upgrade for the District of Lake Country, completed in 2018. The project encompassed three facilities: the Eldorado Treated Water Reservoir, a 6,000 cubic metre reservoir with a valve room, 30-inch water main installation, and full inlet, outlet, overflow, and drain piping; the Glenmore Booster Station, a new building housing two 100hp process water pumps, three custom PRV trains, stainless steel process piping, and a complete HVAC package, boosting pressure from the Glenmore/Okanagan Reservoir to three distribution systems across the District; and the Eldorado Low Lift Station, which treats water from the existing reservoir via chemical injection before feeding the new treated reservoir and the Okanagan Lake distribution system, with three 100hp pumps and 30-inch stainless steel piping throughout.
Coordinates
50.0833, -119.4085
Project
Eldorado Reservoir and Glenmore Booster Station
Status
Completed — 2018


