Wildstone fast-tracked a full WWTP replacement through fall and winter, decommissioning, bypassing, and commissioning the new system without missing a beat.

51.2983, -112.4567
East Coulee Wastewater Treatment Plant
Wildstone was contracted to decommission the existing wastewater treatment plant, install a bypass, and install a new BMBBR/Clarifier system for the Town of Drumheller. The work was fast-tracked and completed through the fall and winter months, inside a live, active facility with confined space and H2S requirements.
East Coulee, AB
Coordinates
51.2983, -112.4567
Project
East Coulee Wastewater Treatment Plant
Status
Completed— 2013