Wildstone fast-tracked a full WWTP replacement through fall and winter, decommissioning, bypassing, and commissioning the new system without missing a beat.

51.2983, -112.4567

East Coulee Wastewater Treatment Plant

Wildstone was contracted to decommission the existing wastewater treatment plant, install a bypass, and install a new BMBBR/Clarifier system for the Town of Drumheller. The work was fast-tracked and completed through the fall and winter months, inside a live, active facility with confined space and H2S requirements.

East Coulee, AB

Coordinates

51.2983, -112.4567

Project

East Coulee Wastewater Treatment Plant

Status

Completed2013