A water treatment plant expansion built in a public park, including four greensand filters, precision tank lifts, and continuous dewatering in a high water table environment.

50.8167, -121.3333

Cache Creek Water Treatment Plant

Wildstone expanded the Village of Cache Creek's water treatment capacity by installing four manganese greensand filters, new chemical injection lines, hypochlorite storage, and all associated process mechanical tied into the existing water system. A pre-engineered building was constructed atop several holding and backwash tanks, with new site piping and tie-ins installed within the local park. The project required continuous dewatering throughout construction due to a very high water table, and precision crane work for tank placement and lifting. The constrained, high-traffic park setting added complexity to site logistics and sequencing.

Cache Creek, BC

Coordinates

50.8167, -121.3333

Project

Cache Creek Water Treatment Plant

Status

CompletedSpring 2013

Let’s Get to Work

If you’re planning a project and need a team that can handle the tough tasks, we’re ready to talk.