DUTEAU CREEK WATER TREATMENT PLANT

Project Info

Description: Wildstone was contracted by the RDNO to construct a new UV Treatment Building at the existing Duteau Creek WTP. The building consisted of a large concrete structure below grade with a steel structure above grade. Within the building, a 1.8m header pipe is split into three 1.2m branches, each with a UV reactor for water purification.

The project also included a concrete wet well within the structure, chemical dosing systems, an emergency/maintenance building bypass, and all ancillary civil, electrical, and mechanical work.

Category: Industrial

×