DUST COLLECTION SYSTEM

Project Info

Description: Construction of two new structural steel buildings and the installation of new scrubbers, ductwork, electrical and controls for the load out infrastructure for Teck Coal.

Category: Industrial

×

14 + 6 =

Or
Contact Us At One Of Our Locations